Virtual Pipeline Solutions
for Industrial Thailand

TJN provides cleaner, reliable, and cost-effective industrial energy through iCNG and LNG — delivered via our patented virtual pipeline system.

What We Supply

[INSERT COPY — brief intro about TJN's product range]

LNG Supply

LNG

LNG sourced from LNG terminals and delivered in liquid form for customers requiring different operational flexibility or larger consumption.

  • Flexible supply for remote industrial sites
  • Clean alternative to conventional liquid fuels
  • Supports long-term energy optimization
LPG and Other Fuels

LPG / Others

For specific industrial requirements, TJN can evaluate LPG or other options based on feasibility, safety, and economics.

  • Case-by-case feasibility assessment
  • Designed around customer operating constraints
  • Aligned with compliance and safety standards

Virtual Pipeline — End to End

From procurement to delivery, our process is designed to keep your operation stable.

Distribution Pipeline
01

Distribution Pipeline

TJN acquires natural gas from PTT through a distribution pipeline system.

Private Mother Station
02

Private Mother Station

Before delivery, natural gas is compressed to 3,600 PSI (250 bar), ensuring efficient storage and transportation.

Customer Site
03

Customer Site

TJN's specialized trailer transports gas to customer sites. The trailer can carry up to 170 MMBTU of compressed natural gas.

Pressure Reducing System
04

Pressure Reducing System

At the customer site, the Pressure Reducing System (PRS) reduces the pressure to a safe and appropriate level for factory use.

PRS — Pressure Reduction System

[INSERT COPY — Describe the patented PRS technology, what makes it unique vs competitors, safety benefits, and how it enables reliable on-site gas delivery]

  • Patented design

    [INSERT COPY — unique feature]

  • Safe on-site operation

    [INSERT COPY — safety features]

  • Easy installation

    [INSERT COPY — installation process]

PRS Pressure Reduction System on-site

End-to-End Support

01

Turnkey Supply & Operations

TJN provides end-to-end support from supply planning to delivery operations. Core equipment (trailers, PRS, metering) can be provided during the purchasing agreement, enabling customers to start using natural gas with minimal upfront burden.

  • Full EPC — design to supply
  • Scheduled around planned factory shutdowns
  • Flexible contract structure
02

24/7 Safety & Maintenance

High-pressure systems require strict operational discipline. TJN supports safe operation through procedures, monitoring, and maintenance coordination with our in-house technical team.

  • On-site PRS installation and commissioning
  • Preventive maintenance planning
  • Emergency response coordination
  • Operational reporting and continuous improvement
03

Flexible Contract Structure

[INSERT COPY — describe flexible contract options tailored to each customer's investment preference]

04

Fuel Conversion Consultation

[INSERT COPY — describe TJN's consultation service for manufacturers considering switching from diesel/LPG/heavy oil to CNG/LNG]

Ready to convert your factory to cleaner fuel?

[INSERT COPY]

Request a Consultation